Skip to main content

Burrard Thermal Generating Station

Location

BC Hydro

Role
• Distributed control system implementation on 3- 150MW gas-fired thermal generators • Control systems supervision, responsible for instrumentation, controls and protection • DCS supply and engineering contract management • Responsible for DCS system drawings generated automatically with InTools • InTools database administration • Commissioning
Burrard Thermal Generating Station