Burrard Thermal Generating Station
Location
BC Hydro
Role
• Distributed control system implementation on 3- 150MW gas-fired thermal generators
• Control systems supervision, responsible for instrumentation, controls and protection
• DCS supply and engineering contract management
• Responsible for DCS system drawings generated automatically with InTools
• InTools database administration
• Commissioning