Enbridge Gretna Station

Location

Manitoba

Role
Set up a metering campaign.  Analyze data to determine if the existing static var compensator control scheme is working as desired.  Compare data against Manitoba Hydro Power Quality Specifications and recommend changes required for compliance.
Enbridge Gretna Station
© 2025 Practical Engineering Ltd. All Rights Reserved. | Sitemap